Xinshe Barracks Area Renovation
Taichung
Special Project
1. Rigid road pavement.
The apron and the runway/taxiway are built with bending resistance 650psi concrete. The regulatory requirement of non-cracking quality adds to the difficulty of construction.
2. Hangar building.
The building is 98.1 m wide * 75 m deep (two buildings) and can house 12 black eagle and cobra attack helicopters; the helicopters land and get washed outdoors.
3. Scaffolding.
For this project, the safety and cost of construction follow the higher CNS (4750) standards.
- Name of Project:
- Xinshe Barracks Area Renovation Project
- Builder :
- Ministry of Defense Armaments Engineering and Production Center
- Design and Surveillance of Construction:
- Yutaisheng Architecture Firm
- Undertaking Unit:
- Kong Chou Construction Co., Ltd.
- Project Overview:
- 1. Joint Machine Room: One floor above ground with RC structure.
2. Flight Simulator Building: Two floors above ground with RC structure.
3. Hangar A: Two floors above ground with RC structure + SRC large-span structure.
4. Hangar B: Two floors above ground with RC structure + SRC large-span structure.
5. Civil Engineering: Rigid road pavement, runway, taxiway and aircraft washing and parking lot.
6. Landscape, plantation, drainage,and AC road pavement.
- Base Area:
- 534,897 M2
- Floor Area:
- 20,947 M2
- Started On:
- 2014-01-30
- Completed On:
- 2015-11-03